Laserfiche WebLink
In Addition to the attached revegetation specifications outlined in Section 20.0 of the <br /> "Standard Work Specifications" included in CDMG General Bid Specifications, 1996, <br /> the following requirements will be adhered to: <br /> The CONTRACTOR will supply the fertilizer, mulch, and equipment for chiseling, <br /> fertilizer application, seeding, mulching and crimping. Revegetation efforts will occur <br /> on approximately seven (7) acres, which includes the backfill, channel side slopes, fan <br /> road, excavated areas and bench areas. <br /> Seed <br /> Seed will be provided by the OWNER. The CONTRACTOR must give the PROJECT <br /> MANAGER at least ten (10) working days notice of the acreage to be seeded, so that <br /> the proper amount of seed is delivered. <br /> Fertilizers <br /> Commercial fertilizer is required for this project. Fertilizer shall be provided by <br /> CONTRACTOR, and shall conform to Section 20.2 of the General Bid Specifications <br /> (1996), attached. <br />