(300) offset from the road direction. Ripping will proceed from the east to the west as operations <br /> move from the northern end of the road to its junction with the main Sutey access road. <br /> Measurement and Payment <br /> Payment for completion of this Task will be per lineal foot of road graded according to <br /> the above specifications. Each of the specified road segments shall be measured <br /> along its center line to the nearest foot. Payment for each road segment shall be made <br /> at the price bid for the individual segments on the Bid Schedule , Items 4 A, B, C, and <br /> D. Such Payment shall cover all costs for accomplishing the grading to specifications <br /> of the roads described in this Task. Payment shall be considered full compensation for <br /> all equipment and labor needed to accomplish grading to original contour the upper <br /> and lower Sutey access roads, and the belt line transfer road, and for grading of the <br /> North West Sutey access road. Payment shall be as this task is completed and <br /> approved by the PROJECT MANAGER. <br /> Task 5 CULVERT REMOVAL <br /> Approximately seven (7) road drainage culverts are located on the roads scheduled for <br /> reclamation during this project. Project Manager will locate each culvert to be removed <br /> and place lathe and flagging at each prior to construction. Excepting the thirty six inch <br /> (36") diameter culvert located on the main Sutey access road, near the confluence of <br /> Ditches 1 and 8, the culverts are generally eighteen to twenty four inches (18" to 24") in <br /> diameter. <br /> Generally, road drainage culverts are buried by three feet (3) or less of ground cover at <br /> the inlet. These culverts are constructed of corrugated metal pipe (CMP) in almost all <br /> instances. <br /> Culverts shall be excavated and removed from the site. All head walls, down drains or <br /> other structures associated with the culverts shall be removed during reclamation. The <br /> trenches which result from the extraction process shall be backfilled to the original <br /> ground surface elevation. The backfill will be mechanically compacted in one foot (1') <br /> lifts. However, the excavation of the large main Sutey access road culvert by Ditches <br /> 1 and 8 does not need to be backfilled, as a low water crossing shall be constructed at <br /> this location (Task 7a). <br /> All culvert materials or scrap encountered shall be collected and transported from the <br /> mine site for disposal by CONTRACTOR. Extracted culverts may be temporarily <br /> stockpiled near the main gate to the Coal Basin Mine. All extracted culverts must be <br /> removed from the site prior to submitting for payment upon completion of this task. <br /> 12 <br />