Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Payment shall be when this task is completed and approved by the PROJECT MANAGER, after <br /> removal of the power poles and ancillary equipment form the site. Such payment shall be <br /> considered full compensation for all labor, materials, equipment and all other items necessary <br /> and incidental to the completion of Task 3, Power Pole Removal. <br /> TASK 4 ROAD GRADING <br /> Four road segments located near the north western portion of the Project Area require grading in <br /> order to promote the desired post reclamation drainage pattern. Because some of the roads <br /> have differing post-reclamation uses, the roads will be graded to different conditions. Three <br /> roads will be backfilled, while one will be sloped and ripped. <br /> Sutey Access and Belt Line Transfer Roads <br /> See Map 3, Project Area, for the locations of these three road segments. Road segment lengths <br /> are estimated to-be 1,850 feet at the Upper Sutey access road, 1,900 feet at the Lower Sutey <br /> access road, 450 feet at the beltline transfer road. NOTE that this portion of Task 4 must be <br /> accomplished in conjunction with Task 5, Culvert Removal. <br /> These roads will be backfilled and graded so that the original contour of each area is <br /> approximated. Material shall be excavated from the outslope of the roads and placed <br /> onto the roadway in order to blend the hill slopes above and below the road segments. <br /> The outslope excavation must not create a slope steeper than the naturally occurring <br /> hill side at the point of excavation. Material placed on the roadway must be compacted <br /> in two feet (2') lifts using a sheeps foot or pad foot roller. The fill shall extend to within <br /> one foot (1') of the crest of the existing road cut. The slope of the fill shall not be <br /> steeper than that of the slopes immediately above and below the fill area. All filled and <br /> excavated areas shall be topsoiled and revegetated. During completion of the topsoil <br /> application, a track hoe will be used to create gouges on the backfilled slopes. The <br /> track hoe bucket will be used to gouge depressions in the slope, so that the excavated dirt is <br /> pulled to the down hill side of the excavation. These gouges will be created so that there is no <br /> more than a four feet (4') separation from the edge of one to the edge of the next in any direction. <br /> The gouges shall be constructed so that they are offset, or overlap, vertically , so that runoff <br /> water cannot flow uninterrupted down the backfilled slope (Figure 1, Soil Hummocks). <br /> North West Sutey Access Road <br /> See Map 3, Project Area, for the location of this road segment. <br /> The estimated length of this road segment is 300 feet. NOTE that this portion of Task 4 must be <br /> completed in conjunction with Task 6, Rolled Dip Construction. <br /> The North West Sutey Access road shall be graded so that a five percent (5%) grade toward the <br /> east is established for the length of the road. Care must be exercised so that dirt is not <br /> introduced into the adjacent roadside ditch. Excavation adjacent to the ditch must be <br /> accomplished by track hoe, back hoe or similar piece of equipment. <br /> Upon completion of grading operations, the road segment will be ripped. The road shall be <br /> ripped to a minimum depth of fifteen inches (15"). Rippers on a machine must not be set more <br /> than thirty inches (30") center to center. The road segment will be ripped across the entire width <br /> of the roadway. Ripping will be accomplished so that ripper lines are created at a thirty degree <br /> 11 <br />