Sutey Refuse Disposal Area <br /> An existing surface channel, Ditch 8, located on the south facing slope of the Sutey Refuse Pile, <br /> will be rebuilt. The channel is non-functional in its present location and condition;as the flow <br /> tends to migrate against and into the toe of the adjacent coal refuse. The ditch will be <br /> reconstructed and relocated to the following specification. <br /> NOTE that Ditch 8 construction must be completed within the first ten (10) days after receipt of <br /> the Notice to Proceed. Construction must be accomplished so that the original ditch continues to <br /> convey water flows until the end of the Project. At that time, the original ditch will be eliminated <br /> and water will be allowed to flow into the new ditch. Note the special grading requirements for <br /> the old ditch, which are described below. <br /> Ditch 8 is an approximately 800 feet long ditch, the upper 200 feet being relatively gentle in <br /> gradient, while the lower 600 feet is very steep. The replacement ditch will be constructed so <br /> that it will receive flow from contributing areas, and transport them safely down the face of the <br /> Sutey Pile to Ditch 1. <br /> Upper Ditch 8 <br /> The upper portion of Ditch 8 is 200 feet in length, and shall be trapezoidal in shape, having a <br /> depth, upon completion of two feet (2'). The base of the channel shall be five feet (5)wide, with <br /> side slopes being 2H:1V. The channel shall be over excavated so that these dimensions are <br /> accomplished upon completion of the ditch. <br /> Upon completion and acceptance of excavation, three inches (3") of topsoil will be uniformly <br /> distributed on the base and sides of the channel. The topsoil will be derived from the topsoil <br /> stockpile located to the west of the Sutey Refuse Pile. In order to achieve successful application <br /> of the liner specified below, it will be necessary to remove surface irregularities and clods and <br /> rock from the surface of the soil. A flat, uniform, rock- and dip - free soil surface must be <br /> established prior to seed and fertilizer application. The seed and fertilizer may not be applied <br /> until such a surface has been created. <br /> Upon completion of topsoiling, diammonium phosphate fertilizer(18-46-0) shall be applied to the <br /> at a rate of 300 pounds per acre. Seed, to be provided by PROJECT MANAGER, will be applied <br /> at the rate of ten pounds (10#) per acre. <br /> After seeding and fertilization is complete, a liner shall be installed. The liner shall consist of <br /> 100% coconut fiber encased top and bottom in heavyweight ultra violet stabilized netting. <br /> Components shall be sewn on 1.5 inch centers. North American Green 125 or approved <br /> equivalent is acceptable. The liner shall be installed per manufacturers specifications. <br /> Lower Ditch 8 <br /> The lower portion of Ditch 8 is approximately 600 feet long, and will be relocated to the east of <br /> its present location. The western most margin of the new ditch shall be located ten feet (10') <br /> east of the eastern most margin of the existing channel. Upon completion of installation, the <br /> upper and lower portions of Ditch 8 will transition into one ditch. <br /> NOTE that the liner specified below must extend four feet (4') beyond the crest of Ditch 8 on <br /> each side. The specifications for liner installation, including soil application, for the four feet (4) <br /> side-of-channel application area are identical to those for installation within the channel, except <br /> that prior to beginning installation, the ground surface will be ripped to a minimum depth of eight <br /> 14 <br />