My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (202)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (202)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:21:40 AM
Creation date
6/13/2012 8:28:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall extend to within one foot (1') of the crest of the existing road cut. The slope of the fill shall <br /> not be steeper than that of the slopes immediately above and below the fill area. All filled and <br /> excavated areas shall be topsoiled and revegetated. <br /> During completion of topsoil application the surfaces of the backfilled roads will be severely <br /> roughened. See Task 9, Topsoil Application and Surface Roughening. <br /> North West Sutey Access Road <br /> The estimated length of this road segment is 300 feet. NOTE that this portion of Task 4 must be <br /> completed in conjunction with Task 5, Rolled Dip Construction. <br /> The North West Sutey Access road shall be graded so that a five percent (5%) grade to the east <br /> (toward the Sutey perimeter ditch) is established for the length of the road. Excavation adjacent <br /> to the ditch must be accomplished so that dirt is not introduced into the roadside ditch. <br /> Upon completion of grading operations, the road segment will be ripped. The road shall be <br /> ripped to a minimum depth of fifteen inches (15"). Rippers on a machine must not be set more <br /> than thirty inches (30") center to center. The road segment will be ripped across the entire width <br /> of the roadway. Ripping will be accomplished so that ripper lines are created at a thirty degree <br /> (300) offset from the road direction. Ripping will proceed from the east to the west as operations <br /> move from the northern end of the road to its junction with the main Sutey access road. The <br /> road surface will then be severely roughened using the techniques outlined in Task 9, Topsoil <br /> Application and Surface Roughening <br /> Measurement and Payment <br /> Payment for completion of this Task will be per lineal foot of road graded according to the above <br /> specifications. Each of the specified road segments shall be measured along its center line to <br /> the nearest foot. Payment for each road segment shall be made at the price bid for the individual <br /> segments on the Bid Schedule, Items 4 A, B, C and D. Such Payment shall cover all costs for <br /> accomplishing the grading to specifications of the roads described in this Task. Payment shall <br /> be considered full compensation for all equipment and labor needed to accomplish grading to <br /> original contour the upper and lower Sutey access roads, and the belt line transfer road, and for <br /> grading of the North West Sutey access road. Payment shall be as this task is completed and <br /> approved by the PROJECT MANAGER. <br /> TASK 5 ROLLED DIP CONSTRUCTION <br /> Rolled dips will be constructed on the north west Sutey access road and on the main Sutey <br /> access road. The purpose of the rolled dips is to channel water from up slope areas off of the <br /> roads to the out sides at frequent intervals. The locations of the rolled dips to be constructed <br /> shall be marked in the field by the PROJECT MANAGER using wood lathe or other suitable <br /> means prior to construction. It is anticipated that two (2) dips will be built on the north west <br /> Sutey access road, and that ten (10) dips will be built on the main Sutey access road. <br /> Rolled dips constructed on the North West Sutey access road will be built to the specifications <br /> contained in Figure 2, North West Sutey Rolled Dips. The dips will be constructed nearly <br /> perpendicular to the road length. Excavated dirt shall be placed on the down slope side of the <br /> dip. The slopes of the dips shall not be steeper than 3HAV. The depth of the ditch at the outlet <br /> as measured from the downslope side of the road adjacent to the dip shall be 1.75 feet. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.