My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 2:37:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 1 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd <br />Task # TTT <br />Page 6 of 19 <br />CIRCES Cost Estimating Software <br />in. thick <br />-Floor <br />16x400x3 <br />Demo. and on -site <br />disposal in excavated <br />pit, 4 in. thick - Max. <br />200 ft. push <br />711.00 <br />SF <br />$1.07 <br />$760.77 <br />Escapeway tunnel <br />6 <br />Pipe, corrugated metal <br />(CMP) - 48 in. <br />diameter pipe <br />6.00 <br />LF <br />$5.92 <br />$35.52 <br />Feed conveyor drive <br />tower - Superstructure <br />21x19x60 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />23,940.00 <br />CF <br />$0.18 <br />$4,381.02 <br />-Floor <br />19x13.5 <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />257.00 <br />SF <br />$1.61 <br />$413.77 <br />- Footings <br />2x3 <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />967.00 <br />LF <br />$19.30 <br />$18,663.10 <br />Transfer structures - <br />Superstructures (3) <br />57x13x38 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />28,158.00 <br />CF <br />$0.18 <br />$5,152.91 <br />-Floor <br />39x10 <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />390.00 <br />SF <br />$1.61 <br />$627.90 <br />Stacking tube 1 <br />94x12x12 in <br />diam <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />10,630.00 <br />CF <br />$0.18 <br />$1,945.29 <br />Stacking tube 2 <br />93x12x 12 in <br />diam <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />10,517.00 <br />CF <br />$0.18 <br />$1,924.61 <br />Stacking tube 3 <br />91x12x 12 in <br />diam <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />10,291.00 <br />CF <br />$0.18 <br />$1,883.25 <br />Tunnel - Floor <br />505x12 x 36 in <br />th <br />Pavement, concrete, <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />36.00 <br />CY <br />$112.00 <br />$4,032.00 <br />-Roof <br />505x12x 36 in <br />th <br />Pavement, concrete, <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />36.00 <br />CY <br />$112.00 <br />$4,032.00 <br />-Walls <br />505x12x3 <br />Pavement, concrete, <br />demolition only, 7 in. to <br />24 in. thick - Reinforced <br />36.00 <br />CY <br />$112.00 <br />$4,032.00 <br />Run -of -mine <br />conveyor <br />1100 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />1,100.00 <br />LF <br />$50.71 <br />$55,781.00 <br />Transfer conveyor <br />100 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />100.00 <br />LF <br />$50.71 <br />$5,071.00 <br />Silo -to -silo conveyor <br />150 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />150.00 <br />LF <br />$50.71 <br />$7,606.50 <br />Breaker -to -silo <br />800 <br />Conveyor, elevated, <br />800.00 <br />LF <br />$50.71 <br />$40,568.00 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 6 of 19 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.