Laserfiche WebLink
conveyor <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />Silo -to- loadout <br />conveyor <br />500 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />500.00 <br />LF <br />$50.71 <br />$25,355.00 <br />Overhead conveyor <br />225 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />225.00 <br />LF <br />$50.71 <br />$11,409.75 <br />Reclaim conveyor <br />555 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />555.00 <br />LF <br />$50.71 <br />$28,144.05 <br />Overhead conveyor <br />225 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />225.00 <br />LF <br />$50.71 <br />$11,409.75 <br />Reclaim conveyor <br />555 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />555.00 <br />LF <br />$50.71 <br />$28,144.05 <br />Topside discharge <br />structure <br />15x15x33 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />7,425.00 <br />CF <br />$0.18 <br />$1,358.78 <br />Dozer trap push wall <br />4x20x10 <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />800.00 <br />SF <br />$3.54 <br />$2,832.00 <br />Escape tunnel <br />180 <br />Pipe, reinforced <br />concrete (RCP) - 48 in. <br />diameter pipe <br />180.00 <br />LF <br />$15.81 <br />$2,845.80 <br />Stacking tube 4 - <br />Superstructure <br />106x1x12 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />11,989.00 <br />CF <br />$0.18 <br />$2,193.99 <br />- Footings <br />2x3 <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />38.00 <br />LF <br />$19.30 <br />$733.40 <br />Overhead conveyor <br />555 <br />Conveyor, elevated, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />555.00 <br />LF <br />$50.71 <br />$28,144.05 <br />Reclaim conveyor <br />555 <br />Conveyor, overland, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />555.00 <br />LF <br />$25.36 <br />$14,074.80 <br />Topside discharge <br />structure <br />15x15x33 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />7,425.00 <br />CF <br />$0.18 <br />$1,358.78 <br />Dozer trap push wall <br />- Superstructure <br />2x3x10 <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />800.00 <br />SF <br />$3.54 <br />$2,832.00 <br />- Footings <br />2x3 <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />80.00 <br />LF <br />$19.30 <br />$1,544.00 <br />Escape tunnel <br />180 <br />Pipe, reinforced <br />concrete (RCP) - 48 in. <br />diameter pipe <br />180.00 <br />LF <br />$15.81 <br />$2,845.80 <br />Silo #1 - <br />Superstructure <br />145x60 <br />Bldg. (MN) demo. /on- <br />site disposal in <br />409,995.00 <br />CF <br />$0.21 <br />$86,508.95 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 7 of 19 <br />CIRCES Cost Estimating Software <br />