Laserfiche WebLink
Gaurd shack - <br />Superstructure <br />12X12X10 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />1,440.00 <br />CF <br />$0.18 <br />$263.52 <br />Substation - <br />Superstructure <br />80X50X20 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />80,000.00 <br />CF <br />$0.18 <br />$14,640.00 <br />-Floor <br />80X50 <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />4,000.00 <br />SF <br />$2.14 <br />$8,560.00 <br />- Footings <br />1.5X3 <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />260.00 <br />LF <br />$14.47 <br />$3,762.20 <br />Takeup tower - <br />Superstructure <br />25x21 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />12,075.00 <br />CF <br />$0.18 <br />$2,209.73 <br />-Floor <br />25x21 <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />525.00 <br />SF <br />$3.22 <br />$1,690.50 <br />- Footings <br />2x3 <br />Demo. and on -site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. 200 <br />ft. push <br />92.00 <br />LF <br />$18.82 <br />$1,731.44 <br />Screening facility - <br />Superstructure <br />62x52x36 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />116,064.00 <br />CF <br />$0.18 <br />$21,239.71 <br />-Floor <br />52x36 <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />1,872.00 <br />SF <br />$1.61 <br />$3,013.92 <br />- Footings <br />1.5x2 <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.5 ft. x 2 ft. - Max. <br />200 ft. push <br />2,389.00 <br />LF <br />$9.64 <br />$23,029.96 <br />Crusher building - <br />Superstructure <br />25x20x42 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />21,000.00 <br />CF <br />$0.18 <br />$3,843.00 <br />-Floor <br />25x20 <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />500.00 <br />SF <br />$1.61 <br />$805.00 <br />- Footings <br />3x2 <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />366.00 <br />LF <br />$19.30 <br />$7,063.80 <br />Reclaim tunnel - <br />Roof <br />16x400x1 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />6,400.00 <br />CF <br />$0.18 <br />$1,171.20 <br />-Walls <br />12x400x3 <br />Wall, concrete, <br />demolition only, <br />average reinforcing - 24 <br />6,400.00 <br />SF <br />$6.85 <br />$43,840.00 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 5 of 19 <br />CIRCES Cost Estimating Software <br />