Laserfiche WebLink
_J <br /> LOADOUT SEDIMENTATION POND DEWATERING <br /> This pond has been surveyed and engineer drawings are being <br /> prepared. It will be de-watered by syphon or pumping within 24 <br /> hours following any runoff event to maintain storage capacity <br /> for a 25 year/24 hour precipitation event. <br /> (Stipulation 33) <br /> 9 .1 (Vol. 7, Chap. VII ) <br />