Laserfiche WebLink
.. r <br /> NECESSARY. RESPONSIBILITY FOR ENFORCEMENT OF POTENTIAL DISCHARGE <br /> PERMIT COMPLIANCE PROBLEMS WILL REST WITH THE WATER QUALITY CONTROL <br /> DIVISION. <br /> COMMITMENT #2 <br /> THE OPERATOR WILL CREATE A SEPARATE SECTION IN EACH ANNUAL <br /> RECLAMATION REPORT THAT WILL INCLUDE DATA AND NARRATIVE TO <br /> DISSEMINATE INFORMATION FROM THE MONITORING PROGRAM REQUIRED BY THE <br /> TERMS OF TR-14. THE OPERATOR WILL NOTIFY THE DIVISION IMMEDIATELY <br /> IN THE CASE THAT TRACER IS DETECTED AT ANY POINT BY THE MONITORING <br /> PROGRAM, OR IF THERE IS INCREASED DISCHARGE TO ANY SURROUNDING <br /> DRAINAGE THAT MAY BE RELATED TO FLOODING OF THE SUNNYSIDE WORKINGS. <br /> COMMITMENT #3 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A DETAILED SUMMARY OF <br /> THE COSTS THAT WOULD BE INCURRED BY THE STATE TO INSTAL REPLACEMENT <br /> BULKHEADS IN THE EVENT OF PERMIT REVOCATION AND BOND FORFEITURE. <br /> A BOND, IN AN AMOUNT APPROVED BY THE DIVISION, MUST BE IN PLACE FOR <br /> BULKHEAD REPLACEMENT PRIOR TO CLOSING THE AMERICAN TUNNEL VALVE. <br /> COMMITMENT #4 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A PLAN TO CHARACTERIZE <br /> CONJUNCTIVE FLOW WITHIN THE CEMENT CREEK DRAINAGE IN THE VICINITY <br /> OF THE SUNNYSIDE MINE WITHIN 30 DAYS OF REVISION APPROVAL. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> Allen C. Sorenson <br /> Reclamation Specialist <br /> cc: Christopher Hayes, Echo Bay <br /> C: \WP51\APPROVE <br />