My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-11-18_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-11-18_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2021 7:25:21 PM
Creation date
6/5/2012 11:56:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
11/18/1993
Doc Name
Revision Approval
From
DMG
To
Sunnyside Gold Corp
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources co�o� <br /> 1.313 Sherman St.,Room 215 h <br /> Denver,CO 80203 <br /> Phone.(303)866-3567 *1876 <br /> FAX (303)832-8106 <br /> Roy Romer <br /> // Governor <br /> k-1 ovember 18, 1993 Michael B.Long <br /> Division Director <br /> r. Larry Perino <br /> /unnyside Gold Corporation <br /> P.O. Box 177 <br /> Silverton, CO 81433 <br /> Re: Revision Approval, Sunnyside Mine, Permit No. M-77-378, <br /> Revision No. TR-014 <br /> Dear Mr. Perino: <br /> On November 18, 1993 the Colorado Mined Land Reclamation Board <br /> conditionally approved the technical revision application submitted <br /> to the Division on March 22, 1993, addressing design details for <br /> installation of water impounding bulkheads within the underground <br /> workings. The terms of the revision approved by the Board are <br /> hereby incorporated into Permit No. M-77-378. <br /> The conditions of Board approval are noted below. Please note that <br /> all other provisions of Permit No. M-77-378 remain in full force <br /> and effect. <br /> COMMITMENT #1 <br /> THE OPERATOR UNDERSTANDS THAT ANY NEW SEEPS OR ANY CHANGES IN WATER <br /> QUALITY OR QUANTITY ISSUING FROM KNOWN SEEPS IN THE AREA OF THE <br /> SUNNYSIDE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS IN THE <br /> UNDERGROUND WORKINGS, ARE REGARDED BY THE WATER QUALITY CONTROL <br /> DIVISION TO BE UNPERMITTED POINT SOURCE DISCHARGES. THE DIVISION <br /> OF MINERALS AND GEOLOGY UNDERSTANDS THAT THE OPERATOR DOES NOT <br /> AGREE WITH THIS INTERPRETATION BY THE WATER QUALITY CONTROL <br /> DIVISION. THE OPERATOR FURTHER UNDERSTANDS THAT ANY MEASURABLE <br /> CHANGE IN WATER QUALITY OR QUANTITY IN THE SEEPS OR THE DRAINAGES <br /> SURROUNDING THE MINE, i.e. CHANGES REPORTED BY THE OPERATOR IN <br /> CONJUNCTION WITH COMPLIANCE WITH THE APPROVED HYDROLOGIC MONITORING <br /> PLAN OR CHANGES REVEALED THRU DIVISION INSPECTIONS OF THE MINE, <br /> WILL BE CONSIDERED BY THE DIVISION AS POSSIBLE EVIDENCE OF THE <br /> DEVELOPMENT OF UNPERMITTED POINT SOURCE DISCHARGES RELATED TO THE <br /> INSTALLATION OF THE BULKHEADS. THEREFORE, SIGNIFICANT CHANGES IN <br /> WATER QUALITY OR QUANTITY IN THE SEEPS OR IN THE DRAINAGES <br /> SURROUNDING THE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS <br /> IN THE UNDERGROUND WORKINGS, WILL BE CITED AS A POTENTIAL <br /> COMPLIANCE PROBLEM BY THE DIVISION AND THE OPERATOR WILL BE <br /> REQUIRED BY THE DIVISION TO CONTACT THE WATER QUALITY CONTROL <br /> DIVISION TO DETERMINE IF A NEW DISCHARGE PERMIT FOR THE MINE OR A <br /> MODIFICATION OF THE EXISTING DISCHARGE PERMIT FOR THE MINE IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.