Laserfiche WebLink
May 30, 2012 C- 1981 - 018 /Deserado Mine DTM <br />The Raw Water Lagoon has been partially filled with water up to the third cell since the last inspection. Only the <br />first pond held water at the time of the current inspection. The dewatering pump was not operating during the time <br />of the inspection due to maintenance issues. Additional rip rap was added at transfer points between each cell. All <br />embankments were stable and vegetation is starting to grow from the recent seeding. <br />Raw Water Lagoon's first cell <br />Drainage ditches from the facility area to Pond DP -1 were stable and armored with rip rap. <br />The Explosives SAE was inspected. The explosives SAE is surrounded by berms which lead anv runoff through a <br />rock check. The SAE was stable with no signs of erosion. <br />The north Rock Dust Tank, Water Tank, Vent Shaft and Radio Tower SAE were also inspected. Each site was <br />stable with no signs of erosion or instability observed. <br />All maintenance regarding culverts and ditches pointed out in the April inspection report has been addressed and <br />fixed. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 6 <br />