My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-01_INSPECTION - C1981018
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
2012-06-01_INSPECTION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:58:33 PM
Creation date
6/4/2012 9:38:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Date
6/1/2012
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
5/30/2012
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 30, 2012 C- 1981 - 018 /Deserado Mine DTM <br />Pond DP -1 <br />Sedimentation Pond RP -2/3 held little water in the two upper cells. No water was being contained in the larger <br />down slope cell. All embankments were well vegetated with no erosion or signs of stability issues. Primary <br />discharge point was clear of all obstructions and in compliance. All emergency spillways for Pond RP -2/3 were <br />well armored with rip rap and stable. <br />Sedimentation Ponds RP -4 and RP -5a were dry at the time of inspection. All embankments were vegetated. <br />Primary discharge points were visible and clear of any obstructions. Emergency spillways were lined with rip rap <br />and stable. A large linear crack was observed in the ground just north of Pond RP -4. Scott Wanstedt believes it has <br />formed due to differential compaction between the undisturbed ground and the pond embankments. The crack <br />does not appear to reach the embankments or cause any stability issues regarding to Pond RP -4. Future inspections <br />will be needed to ensure additional cracking or stability issues do not occur. <br />Pond RP -4. <br />Sedimentation Ponds SS -1, SS -2 and RR -1 were dry at the time of the inspection. All embankments were well <br />vegetated with no erosion or signs of stability issues. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.