Laserfiche WebLink
Site Reclamation Activity <br /> 4/94 - 3/95 <br /> Page 7 <br /> 3) starting to develop the final reclamation contours for the <br /> area behind the pond and a portion of the pond itself. This <br /> will require the disturbance of an additional 2. 75 acres. <br /> These disturbed acres will be seeded and planted as they reach <br /> the final contour . <br /> 4) planting of shrubs. <br /> TAILINGS POND #3 AREA - Plate No. 3 <br /> Activity at this site during the 1994 reporting year consisted of; <br /> 1) breaking up the hardened crust on the sideslope, amending with <br /> 5 tons/acre limestone, seeding with the Mountain Mix at 22 <br /> lbs/acre and mulching with hay at 1 ton/acre. This area has <br /> been planted several times with no positive results. If this <br /> planting is not successful, additional investigation will be <br /> warranted. <br /> 2) removal of surface tailings lines and reshaping of the berm <br /> crest. <br /> Planned activity for 1995 includes; <br /> 1) monitoring and maintenance with additional investigation of <br /> vegetation failure if required. <br /> 2) planting of shrubs. <br /> TAILINGS POND #1 - Plate No. 3 <br /> Activity at this site during the 1994 reporting year consisted of; <br /> 1) fertilization of the established vegetation with liquid <br /> fertilizer (17N 8P 2K) applied at a rate of 50 gal/acre. <br /> 2) planting clumps of aspen trees in small groves. <br /> 3) planting of fireweed and lupine seeds across the area. <br /> Planned activity for 1995 includes; <br /> 1) monitoring and maintenance. <br /> 2) planting of shrubs. <br />