Laserfiche WebLink
Site Reclamation Activity <br /> 4/95 - 3/96 <br /> Page 10 <br /> BULKHEADS - TR-14 / TR-16 <br /> Activity on this project during the 1995 reporting year consisted <br /> of; <br /> 1) the continuation of the seep, spring and flowing adit <br /> inventory required by TR-14 . Twenty percent of the sites were <br /> required to be sampled and all sites monitored for field <br /> parameters twice. SGC monitored and sampled each site twice <br /> (if flow existed) during the reporting year. <br /> 2) the removal of equipment and other materials from the mine to <br /> prepare for final bulkhead construction in the American Tunnel <br /> 3) construction and grouting of the American Tunnel bulkhead. <br /> 4) continued negotiations with CDPHE for a settlement agreement <br /> to provide an acceptable path to both parties for valve <br /> closure and final release from SGC's tunnel discharge CDPS <br /> permits. These negotiations were ongoing at the end of the <br /> reporting year. The final document went to public comment and <br /> was finally signed by WQCD on May 6, 1996 and entered by the <br /> Court (to settle SGC's request for Declaratory Judgement) on <br /> May 8, 1996. This is in the form of a Consent Decree and <br /> Order that provides for SGC to perform listed Mine Remediation <br /> Project's (MRP's) under inspection of DMG for compliance with <br /> the work plans for each MRP. <br /> Planned activity for 1996 includes; <br /> 1) valve closures and bulkhead monitoring. <br /> 2) continuation of the seep, spring and flowing adit inventory <br /> according to TR-14 . <br /> 3) implementation of the provisions of the Consent Decree and <br /> Order. <br />