Laserfiche WebLink
Site Reclamation Activity <br /> 4/95 - 3/96 <br /> Page 9 <br /> Planned activity for 1996 includes; <br /> 1) monitoring and maintenance of the vegetation. <br /> 2) additional planting of shrubs. <br /> ENGINEERING OFFICE SETTLING PONDS - Plate No. 3 <br /> Activity at this site during the 1995 reporting year consisted of; <br /> 1) fertilization of the areas planted in 1994 with liquid <br /> fertilizer (32-0-0) at a rate of 50 gallons per acre. <br /> 2) planting shrubs across some of the area. <br /> Planned activity for the 1996 reporting year consists of; <br /> 1) monitoring and maintenance of the vegetation. <br /> 2) use of the quonset building for storage and as a staging area. <br /> INTERPRETIVE SIGN AREA - Plate No. 3 <br /> Activity at this site during the 1995 reporting year consisted of; <br /> 1) improvement of the entrance area. <br /> 2) installation of a chain fence to discourage access to the <br /> steep slopes bordering the area. <br /> 3) installation of a boulder barrier to discourage vehicles from <br /> driving over the vegetated area. <br /> 4) repair and planting of a portion of the vegetated area. The <br /> Mountain Mix was used at an approximate rate of 22 lbs pls per <br /> acre and then mulched with hay at a rate of 1 ton per acre. <br /> Activity planned for 1996 includes; <br /> 1) monitoring and maintenance of the vegetation and site. <br /> 2) planting of a few shrubs in the area. <br />