My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-10_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1996-06-10_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 6:47:12 AM
Creation date
6/1/2012 11:01:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/10/1996
Doc Name
Annual Fee/Report/Map
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br /> 4/94 - 3/95 <br /> Page 7 <br /> The American Tunnel waste dump material and Lead Carbonate <br /> tailings were used to bring portions of the east end and west <br /> end up to what is anticipated to be the final reclaimed <br /> subgrade. This material as placed was mixed with alkaline <br /> material to provide an initial pH adjustment from acidic to <br /> near neutral or alkaline. This material was then capped with <br /> 2 feet minimum of overburden from the borrow area behind and <br /> close to Tailings Pond #4. <br /> 2) realigning the upslope runoff diversion ditch on the west end <br /> of Tailings Pond #4 to allow the backslopes to be stabilized <br /> for final reclamation (AM-004) . The invert of this realigned <br /> ditch was lined with 40 mil PVC liner which was then covered <br /> with subsoil material and the steeper section armored with <br /> rock. In addition, a steep natural upland drainage path into <br /> this ditch was lined with 40 mil PVC liner and rock armored. <br /> Subsurface water interception and toe drains were also <br /> installed along most of the finished ditch behind the pond to <br /> divert upland water around the pond and stabilize the finished <br /> backslopes. <br /> 3) planting the finished backslopes with the Mountain Mix <br /> (attached in Appendix A) as well as the pond top surface that <br /> was brought to the anticipated final grade and capped. <br /> Seeding was at a rate of 22 lbs pls/acre. These areas were <br /> also fertilized with liquid fertilizer ( 32-0-0) at a rate of <br /> 50 gallons per acre and mulched with 1 ton per acre of hay <br /> mulch. The steepest slopes were also covered with netting <br /> material and/or erosion blankets to hold the mulch in place <br /> and minimize erosion while the vegetation is being <br /> established. <br /> 4) planting of miscellaneous shrubs across the area. <br /> Planned activity for 1996 includes; <br /> 1) maintenance of the vegetation as required and planting of more <br /> shrubs and trees across the area. <br /> 2) usage of the area for deposition of material removed from the <br /> American Tunnel and Terry Tunnel settling ponds and other site <br /> reclamation waste material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.