Laserfiche WebLink
Site Reclamation Activity <br /> Page 6 <br /> Planned activity for 1993 includes: <br /> 1) completion of the drainage ditch and other finish grading <br /> details . <br /> 2) maintenance of any vegetation resulting from the fall seeding <br /> and reseeding any areas disturbed by 1993 activity. <br /> TAILINGS POND NO. 1 - Plate No. 3 <br /> Activity at this site during the 1992 reporting year consisted of <br /> recontouring the pond and covering with overburden material as <br /> approved in TR-13. the entire area was seeded with the "Mountain <br /> Mix" in late fall and aspen trees were planted on the side-slopes. <br /> Planned activity for 1993 includes: <br /> 1) completion of minor grading details not completed in 1992. <br /> 2) repair of any erosion experienced through heavy spring runoff <br /> conditions. <br /> 3 ) reseeding of areas of sparse growth from fall planting and <br /> maintenance of areas containing good growth and planted aspen <br /> trees. <br /> TAILINGS POND NO. 2 - Plate No. 3 <br /> Activity at this site consisted of replanting areas that suffered <br /> seed wash-out during heavy summer rains, planting of aspen trees on <br /> the slopes and fertilization with liquid fertilizer (40-45-50) . <br /> Planned activity for 1993 includes : <br /> 1) maintenance of vegetation and repair of any erosion paths from <br /> heavy spring runoff conditions. <br /> ENGINEERING OFFICE SETTLING PONDS - Plate No. 3 <br /> Activity at this site during the 1992 reporting year consisted of <br /> applying limestone as recommended by soil tests (2-5 tons/acre) , <br /> fertilization with liquid fertilizer (40-45-50) and some reseeding. <br />