Laserfiche WebLink
ro <br /> N <br /> TABLE A <br /> Acreage Disturbed and Reclaimed by Site <br /> Acreage Total Acreage Total <br /> Disturbed Acreage Reclaimed Acreage in <br /> Acre 1993 Disturbed 1993 Reclamation Phase <br /> --------------------------------------------------------------------------------------------- <br /> American Tunnel 0 11 . 5 0 3.3 (In Progress) <br /> Terry Tunnel 0 4 . 3 0 0 <br /> Sunnyside Basin 0 66 . 4 0 66.4 (In Progress) <br /> Tailings Pond #4 1 .8 43 . 5 10. 6 24.8 (In Progress) <br /> Tailings Pond #3 0 9 . 5 0 9.5 (In Progress) <br /> Tailings Pond #1 & #2 0 51 . 7 0 51.7 (In Progress) <br /> Engineering Office <br /> Settling Ponds 0 15. 7 0 10. 7 (In Progress) <br /> Mayflower Mill 0 10. 2 0 1.6 (In Progress) <br /> --------------------------------------------------------------------------------------------- <br /> TOTAL 1 . 8 212.8 10. 6 168.0 (In Progress) <br />