Laserfiche WebLink
Site Reclamation Activity <br /> Page 7 <br /> TAILINGS POND NO. 1 - Plate No. 3 <br /> Activity at this site during the 1993 reporting year consisted of : <br /> 1) minor grading on the backslope areas that was not completed <br /> previously. After regrading, the areas were seeded and <br /> mulched . <br /> 2) fertilization of the established vegetation with liquid <br /> fertilizer (7. 17N 5. 38P 8 . 96K) . <br /> 3) repair of areas that experienced erosion from the heavy <br /> spring runoff. The major area where this occurred was along <br /> the toe bordering Hwy. 110. A section of this area was <br /> armored with 2" - 8" rock . <br /> 4) reseeding areas of limited growth with the Mountain Mix at a <br /> rate of 22 lbs/acre. These areas were then mulched with hay <br /> at a rate of 1 ton/acre. <br /> 5) drilling a line of holes upgradient of the pond to determine <br /> depth to bedrock and groundwater. <br /> Planned activity for 1994 consists of: <br /> 1) monitoring and maintenance of vegetation. <br /> 2) repair of any erosion paths. <br /> TAILINGS POND NO. 2 - Plate No. 3 <br /> Activity at this site during the 1993 reporting year consisted of : <br /> 1) repair of erosion channels. <br /> 2) grading of backslopes that were not completed previously. <br /> 3) fertilization of existing vegetation with liquid fertilizer <br /> (7 . 17N 5 . 38P 8 . 96K) . <br /> 4) drilling a few holes upgradient to the tailings pond to <br /> determine the depth to bedrock and groundwater . <br /> Planned activity for the 1994 reporting year consists of: <br /> 1) monitoring and maintenance of the vegetation. <br />