My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-06-10_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1994-06-10_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 2:59:22 PM
Creation date
6/1/2012 10:59:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/10/1994
Doc Name
Annual Fee/Report/Map
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br /> Page 6 <br /> TAILINGS POND #4 - Cont ' d <br /> 3) fertilization of the established vegetation with liquid <br /> fertilizer (7 . 17N 5. 38P 8 . 96K) . <br /> 4) seeding and mulching of areas with weak vegetation <br /> establishment . The seed used was the Mountain Mix and hay <br /> mulch, where used , was applied at a rate of 1 ton/acre. <br /> 5) completion of cleaning and regrading the settling ponds <br /> across Hwy. 110 and to the south of Tailings Pond No. 4 . This <br /> area was seeded with the Mountain Mix at 22 lbs/acre and <br /> mulched with hay at 1 ton/acre. <br /> 6) monitoring and maintenance of the vegetation growth. <br /> 7) drilling a line of holes upgradient of the pond to determine <br /> the depth to groundwater and bedrock . <br /> Planned activity for 1994 includes: <br /> 1) completion of the stormwater/groundwater ditch. <br /> 2) usage of the area for deposition of sludge from the Terry <br /> Tunnel and American Tunnel water treatment settling ponds . <br /> 3) maintenance of the vegetation established to-date. <br /> TAILINGS POND NO. 3 AREA - Plate No . 3 <br /> Activity at this site during the 1993 reporting year consisted of : <br /> 1) completion of the sideslopes of the ditch at the back of the <br /> pond. <br /> 2) seeding and mulching of the areas that were missed in 1992. <br /> The seed mix used was the Mountain Mix and hay mulch was <br /> applied at a rate of 1 ton/acre. <br /> 3) an application ( initial treatment) of limestone at 5 tons/acre <br /> to the side-slopes to provide long-term neutralization <br /> potential . <br /> 4) drilling of holes upgradient from the pond to determine the <br /> depth to groundwater and bedrock. <br /> Planned activity for 1994 includes: <br /> 1) maintenance of vegetation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.