4 ,000 feet on San Juan County Road 2S . Both oversized <br /> and fine wastes will be replaced in the preexisting <br /> rock dumps in order to assure that no additional areas <br /> are disturbed . Total disturbance due to gravel <br /> extraction activities will be less than two (2) acres. <br /> Exploration drilling will be done with a skid <br /> mounted drill rig which will be towed from site to site <br /> by dozer . Site preparation, consisting of minor <br /> leveling work , will be accomplished with a dozer . The <br /> cumulative area to be disturbed during exploration <br /> drilling activities will be less than one acre. <br /> TIME SCHEDULE OF OPERATIONS <br /> The following time schedule is anticipated for the <br /> gravel screening and exploration drilling operations. <br /> Beginning Completion <br /> Activity Date Date <br /> 1 . Mobilize screen September 1987 November 1987 <br /> plant ,generator , September 1988 November 1988 <br /> and loader to September 1989 November 1989 <br /> Sunnyside Basin. September 1990 November 1990 <br /> 2. Screen and haul September 1987 November 1987 <br /> to Terry Tunnel September 1988 November 1988 <br /> September 1988 November 1989 <br /> September 1988 November 1990 <br /> 3 . Discontinue opera-, October 1987 November 1987 <br /> tions, clean-up and October 1988 November 1988 <br /> reclaim site October 1989 November 1989 <br /> October 1990 November 1990 <br /> 4 . Mobilize drill rig August 1987 August 1987 <br /> to Sunnyside Basin <br /> S . Drill August 1987 December 1987 <br /> 6 . Reclaim drill sites December 1987 December 1987 <br /> -4- <br />