EXHIBIT L - RECLAMATION COST ESTIMATE
<br /> �Fc rL
<br /> *************'***CURRENT BOND **** *«.*.*.�. '"PROPOSED BOND
<br /> sj •� 99, Unit Cost Unit Quantity Extended Cost Unit Cost Unit Quantity Extended Cost
<br /> $ -- -- $ $ -- - - -$ ---
<br /> d'
<br /> SUHNYSIDE BASIIWLAKI� MI1 A04
<br /> W*sh1_%t2n Pit
<br /> -Contour Establishment $1 G.Y. 1,037 $1,037
<br /> -Cover&Grade Pit Bottom $1 C.Y. 17,778 $17,778
<br /> -Construct Compacted Clay Liner $2 G.Y. 10,000 $20,000
<br /> -Fine Grading, Seed Bed Prep. $300 acre 6.2 $1,860
<br /> -Seed, Mulch, Fertilize $800 acre 6.2 $4,960
<br /> -Monitoring&Maintenance $2,282 L.S. 1 $2,282 $2,282 L.S. 1 $2,282
<br /> Sunnyside-M
<br /> -Contour Establishment $1 G.Y. 1,037 $1,037
<br /> -Cover&Grade Pit Bottom $1 C.Y. 8,889 $8,889
<br /> -Construct Compacted Clay Liner $2 C.Y. 4,800 $9,600
<br /> -Fine Grading, Seed Bed Prep. $300 acre 2.8 $840
<br /> -Seed, Mulch, Fertilize $800 acre 2.8 $2,240
<br /> -Monitoring&Maintenance $1,130 L.S. 1 $1,130 $1,130 L.S. 1 $1,130
<br /> Topsoil
<br /> -Topsoil Placement $0.50 C.Y. 17,600 $8,800
<br /> Waste or_ae Arm No..I
<br /> -Final Slope Contours $0.14 C.Y. 187,300 $26,222
<br /> V fAste-Storage Area Now
<br /> -Final Slope Contours $0.14 C.Y. 335,000 $46,900
<br /> I aks Emma
<br /> -Backfill Basin $1 G.Y. 385,000 $385,000 $1 C.Y. 35,000 $35,000
<br /> -Construct Compacted Clay Liner $2 C.Y. 10,500 $21,000 $2 C.Y. 10,500 $21,000
<br /> -Rough Site Grading $300 acre 32 $9,600 $300 acre 6 $1,800
<br /> -Fine Grading, Seed Bed Prop. $150 acre 32 $4,800 $150 acre 6 $900
<br /> -Seed, Mulch, Fertilize $800 acre 10 $8,000 $800 acre 6 $4,800
<br /> -Monitoring&Maintenance $21,420 L.S. 1 $21,420 $6,350 L.S. 1 $6,350
<br /> Constructed Roads
<br /> -Recontour Constructed Roads $300 acre 3.47 $1,041 $300 acre 1.8 $540
<br /> Subtotal Lake Emma/Sunnyside Basin $604,436 $73,802
<br /> L-1
<br />
|