Laserfiche WebLink
EXHIBIT A - LEGAL DESCRIPTION <br /> Page 3 <br /> CLAIM NAME SURVEY NO. BLM CMC NO. <br /> Juan Carlos Millsite 5461 <br /> Basque Millsite 5462 <br /> Overflow Millsite 48417 <br /> AMERICAN TUNNEL <br /> The American Tunnel permit area contains approximately 22.05 acres. <br /> Latitude - Between approximately 37' 53' 18" and 37' 53' 28" <br /> Longitude - Between approximately 107' 38' 50" and 107' 39' 13" <br /> The permit area for the American Tunnel area covers portions or all of the following patented and <br /> unpatented mining claims: <br /> CLAIM NAME SURVEY NO. BLM CMC <br /> Herbert Placer 13562 <br /> Harrison Millsite 14710B <br /> Anglo Saxon Lode 14875 <br /> Lead Carbonate Millsite 20726 <br /> American Tunnel No. 1 6347 <br /> Gladstone Millsite 82529 <br /> Bridge Millsite 167890 <br /> ACCESS ROADS <br /> All roads are public access, including the road serving the Terry Tunnel and Lake Emma sites - <br /> County Road 25 <br /> PERMIT AREA SUMMARY <br /> AREA ACREAGE <br /> Lake Emma / Sunnyside Basin 66.50 <br /> Terry Tunnel 7.12 <br /> Mayflower Mill / Tailings Pond 147.97 <br /> American Tunnel 22.05 <br /> TOTAL PERMIT AREA 243.65. <br /> A-3 <br />