My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-12-01_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1997-12-01_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:07 PM
Creation date
5/30/2012 7:00:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
12/1/1997
Doc Name
Bond Reduction Request and Permit Area Reduction Request
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
SR2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L - RECLAMATION COST ESTIMATE <br /> *************'***CURRENT BOND ***************t**'"* ***********"* PROPOSED BOND <br /> Unit Cost Unit Quantity Extended Cost Unit Cost Unit Quantity Extended Cost <br /> EUREKA STAGING AREA <br /> -Grade $300 acre 12.4 $3,720 <br /> Subtotal Eureka Staging Area 3720 <br /> TERRY TUNNEL <br /> -Construct Portal Hydraulic Seal $25,000 L.S. 1 $25,000 <br /> -Backfill Adit $1.50 C.Y. 200 $300 $1.50 G.Y. 200 $300 <br /> -Refuse Area Clean-up and Disposal $1,000 I .S. 1 $1,000 $1,000 L.S. 1 $1,000 <br /> -Refuse Burial&Site Grading $1 C.Y. 7000 $7,000 $1 C.Y. 7000 $7,000 <br /> -Fine Grading, Seed Bed Prep. $150 acre 5 $750 $150 acre 5 $750 <br /> -Sued, Mulch, Fertilize $800 acre 5 $4,000 $800 acre 5 $4,000 <br /> -Monitoring&Maintenance $1,903 L.S. 1 $1,903 $1,903 L.S. 1 $1,903 <br /> Subtotal Terry Tunnel $39,953 $14,953 <br /> AMERICAN TUNNEL <br /> -Construct Portal Hydraulic Seal $25,000 L.S. 1 $25,000 <br /> -Backfili Adit $1.50 C.Y. 200 $300 $1.50 C.Y. 200 $300 <br /> -Refuse Area Recontouring&Burial $1 C.Y. 15000 $15,000 <br /> -Surface Facilities Dismantling&Disposal or Removal $50,000 L.S. 1 $50,000 $30,000 L.S. 1 $30,000 <br /> -Decommission Settling Ponds $1 C.Y. 2000 $2,000 $1 C.Y. 2000 $2,000 <br /> -Rough Site Grading $300 acre 26 $7,800 $300 acre 14 $4,200 <br /> -Fine Grading, Seed Bed Prep. $150 acre 26 $3,900 $150 acre 14 $2,100 <br /> -Seed, Mulch, Fertilize $800 acre 26 $20,800 $800 acre 14 $11,200 <br /> -Cement Creek Diversion Removal&Road Reclamation $6,000 L.S. 1 $6,000 <br /> -Monitoring&Maintenance $6,240 L.S. 1 $6,240 $6,240 L.S. 1 $6,240 <br /> Subtotal American Tunnel $131,040 $62,040 <br /> MAYFLOWER MILUTAILINGS POND* <br /> Mayflower Mill Site <br /> L-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.