Laserfiche WebLink
EXHIBIT L - RECLAMATION COST ESTIMATE <br /> *************'***CURRENT BOND ***************t**'"* ***********"* PROPOSED BOND <br /> Unit Cost Unit Quantity Extended Cost Unit Cost Unit Quantity Extended Cost <br /> EUREKA STAGING AREA <br /> -Grade $300 acre 12.4 $3,720 <br /> Subtotal Eureka Staging Area 3720 <br /> TERRY TUNNEL <br /> -Construct Portal Hydraulic Seal $25,000 L.S. 1 $25,000 <br /> -Backfill Adit $1.50 C.Y. 200 $300 $1.50 G.Y. 200 $300 <br /> -Refuse Area Clean-up and Disposal $1,000 I .S. 1 $1,000 $1,000 L.S. 1 $1,000 <br /> -Refuse Burial&Site Grading $1 C.Y. 7000 $7,000 $1 C.Y. 7000 $7,000 <br /> -Fine Grading, Seed Bed Prep. $150 acre 5 $750 $150 acre 5 $750 <br /> -Sued, Mulch, Fertilize $800 acre 5 $4,000 $800 acre 5 $4,000 <br /> -Monitoring&Maintenance $1,903 L.S. 1 $1,903 $1,903 L.S. 1 $1,903 <br /> Subtotal Terry Tunnel $39,953 $14,953 <br /> AMERICAN TUNNEL <br /> -Construct Portal Hydraulic Seal $25,000 L.S. 1 $25,000 <br /> -Backfili Adit $1.50 C.Y. 200 $300 $1.50 C.Y. 200 $300 <br /> -Refuse Area Recontouring&Burial $1 C.Y. 15000 $15,000 <br /> -Surface Facilities Dismantling&Disposal or Removal $50,000 L.S. 1 $50,000 $30,000 L.S. 1 $30,000 <br /> -Decommission Settling Ponds $1 C.Y. 2000 $2,000 $1 C.Y. 2000 $2,000 <br /> -Rough Site Grading $300 acre 26 $7,800 $300 acre 14 $4,200 <br /> -Fine Grading, Seed Bed Prep. $150 acre 26 $3,900 $150 acre 14 $2,100 <br /> -Seed, Mulch, Fertilize $800 acre 26 $20,800 $800 acre 14 $11,200 <br /> -Cement Creek Diversion Removal&Road Reclamation $6,000 L.S. 1 $6,000 <br /> -Monitoring&Maintenance $6,240 L.S. 1 $6,240 $6,240 L.S. 1 $6,240 <br /> Subtotal American Tunnel $131,040 $62,040 <br /> MAYFLOWER MILUTAILINGS POND* <br /> Mayflower Mill Site <br /> L-2 <br />