Laserfiche WebLink
April 2012 <br />Page 3 -5 <br />Further, there are no above - ground piping systems present at the NECC Facility. All ASTs at <br />this facility utilize hoses for fueling operations. <br />3.9 Brittle Fracture Evaluation [40 CFR 112.7(i)] <br />There are no field constructed tanks on the premises. <br />3.10 Conformance with Colorado State and Local Applicable Requirements <br />3.10.1 SPCC Compliance [112.7(a)(1) & 112.7(a)(2) & 112.70)] <br />A preliminary list of items that may be required from the Colorado Division of Oil and Public <br />Safety is bulleted below. Note that only tanks 660 gallons and larger capacities are included in <br />the State of Colorado Regulations. Appendix K has copies of relevant forms listed below. <br />• Application Form with detailed site layout <br />• Registration Form <br />• Fuel Tank/Waste Oil Tank Ullage Logs <br />• Signage near all ASTs: <br />• Warning: It is unlawful to dispense gasoline into unapproved containers <br />• No Smoking <br />• Stop Engine <br />• Emergency Instructions —in case of fire or spill <br />• Use emergency stop button (if applicable) <br />• Report accident—appropriate phone numbers for mine official <br />SPCC Plan <br />MR 115 Page 27 -18 Rev. May 2012 <br />