Laserfiche WebLink
April 2012 <br />Table 1 -1. NECC SPCC Cross Reference <br />CFR <br />SPCC <br />Provision <br />SPCC Heading <br />Section <br />112.3(d) <br />PE Certification <br />1 <br />112.3(e) <br />SPCC Location Plan <br />2 <br />112.5 <br />Plan Review <br />1 <br />112.7 <br />Management Approval <br />1 <br />112.7 <br />Cross Reference with 40 CFR 112 <br />1 <br />112.7(a)(3) <br />NECC Facility Information <br />2 <br />112.7(a)(4) <br />Discharge Reporting <br />3 <br />112.7(a)(5) <br />Discharge Response <br />5 <br />112.7(b) <br />Potential Discharge <br />3 <br />112.7(c) <br />Secondary Containment Structures <br />3 <br />112.7(d) <br />Practicability of Secondary Containment Structures <br />3 <br />112.7(e) <br />Inspections, Tests and Records <br />3 <br />112.7(f) <br />NECC Personnel, Training, and Discharge Prevention <br />3 <br />112.7(g) <br />Facility Security <br />3 <br />112.7(h) <br />Tank Truck Loading /Unloading <br />3 <br />112.7(i) <br />Brittle Failure Analysis <br />3 <br />112.70) <br />Conformance with Applicable Standards <br />3 <br />112.8(b) <br />NECC Facility Drainage <br />4 <br />112.8(c)(1) <br />Bulk Storage Containers <br />4 <br />112.8(c)(2) <br />Secondary Containment Structures <br />4 <br />112.8(c)(3) <br />Secondary Containment Drainage <br />4 <br />112.8(c)(4) <br />Corrosion Protection <br />4 <br />112.8(c)(5) <br />Partially Buried Storage Tanks <br />4 <br />112.8(c)(6) <br />Inspection of Bulk Storage Containers <br />4 <br />112.8(c)(7) <br />Heating Coils <br />4 <br />112.8(c)(8) <br />Overfill Prevention <br />4 <br />112.8(c)(9) <br />Effluent Treatment <br />4 <br />112.8(c)(10) <br />Visible Discharge <br />4 <br />112.8(c)(11) <br />Portable Containers <br />4 <br />112.8(d) <br />Transfer Operations <br />4 <br />112.20(e) <br />Substantial Harm Determination <br />Appendix B <br />SPCC Plan <br />Page 1 -4 <br />MR 115 Page 27 -10 Rev. May 2012 <br />