Laserfiche WebLink
Page 6 of 80 <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.1937 <br />Adjusted unit production: <br />Adjusted fleet production: <br />240.81 LCY /hr <br />722.43 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $1.108/LCY <br />Total] ob time: <br />Total job cost: <br />0.16 Hours <br />$129.07 <br />CIRCES Cost Estimating Software <br />