My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-04_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2012-05-04_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:21 PM
Creation date
5/4/2012 9:08:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/4/2012
Doc Name
Email Regarding Reclamation Cost Estimate
From
Susan Burgmaier
To
Mike Boulay
Type & Sequence
PR5
Email Name
SLB
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 80 <br />BULLDOZER WORK <br />Task description: <br />Site: Roadside Portals <br />ade South Fan Area Berm <br />Permit Action: Permit Revision 5 <br />PROJECT IDENTIFICATION <br />Task #: 004 State <br />Date: 5/1/2012 County <br />User: SLB <br />Colorado <br />Mesa <br />Agency or organization name: DRMS <br />Pennit/Job #: C1981041 <br />Abbreviation: None <br />Filename: C041 -004 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />100 <br />Horsepower: 405 <br />1.165 <br />Blade Type: Semi - Universal <br />117 LCY <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown <br />Utilization % <br />Ownership Cost/Hour: $80.19 <br />NA <br />Operating Cost/Hour: $148.12 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.49 <br />NA <br />Total unit Cost/Hour: $266.79 <br />Total Fleet Cost/Hour: $800.38 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />100 <br />Swell factor: <br />1.165 <br />Loose volume: <br />117 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division Estimate <br />Cat Handbook <br />100 feet <br />1,243.2 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 20% <br />Average site altitude: 4,850 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.