Laserfiche WebLink
Page 4 of 80 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.225 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4354 <br />Adjusted unit production: <br />Adjusted fleet production: <br />396.43 LCY /hr <br />1189.29 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.673/LCY <br />Total job time: <br />Total job cost: <br />12.24 Hours <br />$9,800.41 <br />CIRCES Cost Estimating Software <br />