Laserfiche WebLink
Page 3 of 80 <br />BULLDOZER WORK <br />Task description: <br />Site: Roadside Portals <br />Backfill North Decline Area Sediment Control Structures <br />Permit Action: Permit Revision 5 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 5/1/2012 County: Mesa <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />$148.12 <br />Total unit Cost/Hour: $266.79 <br />Total Fleet Cost/Hour: $800.38 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,500 <br />Swell factor: 1.165 <br />Loose volume: 14.563 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Table 14 -1 <br />Cat Handbook <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />-10% <br />4,850 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />NA <br />Operating Cost/Hour: <br />$148.12 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $266.79 <br />Total Fleet Cost/Hour: $800.38 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,500 <br />Swell factor: 1.165 <br />Loose volume: 14.563 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Table 14 -1 <br />Cat Handbook <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />-10% <br />4,850 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AV&) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />GEN.) <br />Pennit/Job #: C1981041 <br />Abbreviation: None <br />Filename: C041 -003 <br />CIRCES Cost Estimating Software <br />