Laserfiche WebLink
Page 7 of 80 <br />BULLDOZER WORK <br />Task description: <br />Site: Roadside Portals <br />Regrade Cameo Mine Sediment Control Structures & Substation <br />Permit Action: Permit Revision 5 Permit/Job #: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 007 State <br />Date: 5/1/2012 County <br />User: SLB <br />Colorado <br />Mesa <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />Total unit Cost/Hour: $266.79 <br />Total Fleet Cost/Hour: $800.38 <br />MATERIAL QUANTITIES <br />Initial Volume: 25,000 <br />Swell factor: 1.165 <br />Loose volume: 29,125 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />0% <br />5,000 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50 % Earth <br />Job Condition Correction Factor Source <br />Abbreviation: None <br />Filename: C041 -007 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />NA <br />Operating Cost/Hour: <br />$148.12 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $266.79 <br />Total Fleet Cost/Hour: $800.38 <br />MATERIAL QUANTITIES <br />Initial Volume: 25,000 <br />Swell factor: 1.165 <br />Loose volume: 29,125 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />910.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />0% <br />5,000 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50 % Earth <br />Job Condition Correction Factor Source <br />Abbreviation: None <br />Filename: C041 -007 <br />CIRCES Cost Estimating Software <br />