Laserfiche WebLink
Protection of Archaeological Resources <br />IF OPERATOR DISCOVERS ANY CULTURAL REMAINS, MONUMENTS OR SITES, <br />OR ANY OBJECT OF ANTIQUITY, OPERATOR SHALL IMMEDIATELY CEASE <br />ACTIVITY AND REPORT DIRECTLY TO BLM AREA MANAGER. THE BLM SHALL <br />TAKE ACTION AS REQUIRED UNDER THE ACTS AND REGULATIONS. <br />OPERATOR SHALL FOLLOW MITIGATION REQUIREMENTS SET FORTH BY BLM <br />CONCERNING PROTECTION, PRESERVATION OR DISPOSITION OF ANY SITES <br />OR MATERIAL DISCOVERED. COST OF SALVAGE EXCAVATION, IF NECESSARY, <br />SHALL BE BORNE BY THE OPERATOR UNLESS OTHERWISE STATED. <br />Stipulation No. 51 <br />Protection of Seasonal Wildlife Habitat <br />IN ORDER TO PROTECT IMPORTANT SEASONAL WILDLIFE HABITAT (BIG GAME, <br />SEVERE WINTER RANGE), EXPLORATION, DRILLING AND OTHER <br />DEVELOPMENT ACTIVITY MAY NOT BE ALLOWED FOR UP TO 60 DAYS DURING <br />THE PERIOD FROM DECEMBER 1 THROUGH MARCH 31. THIS LIMITATION DOES <br />NOT APPLY TO MAINTENANCE AND OPERATION OF EXISTING FACILITIES. <br />EXCEPTIONS TO THIS LIMITATION IN ANY YEAR MAY BE SPECIFICALLY <br />AUTHORIZED IN WRITING BY THE AREA MANAGER, BUREAU OF LAND <br />MANAGEMENT. <br />Stipulation No. 52 <br />Construction of Drill Sites and Access Roads <br />DRILL SITES AND ACCESS ROADS CONSTRUCTED PURSUANT TO TR -44 SHALL <br />BE LOCATED AS AUTHORIZED BY THE BUREAU OF LAND MANAGEMENT TO <br />ENSURE PROTECTION OF ARCHAEOLOGICAL RESOURCES. <br />Section IV <br />Enforcement Actions <br />This section is a review of the enforcement actions issued since the last permit renewal <br />(RN -05) in June 2009. There have been no enforcement actions taken in the last 2'/2 <br />years since the approval of Permit Renewal No. 5. The last enforcement action was <br />taken in July 2002 at this site. <br />Section V <br />Summary and Discussion <br />8 <br />