My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-24_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2012-04-24_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:45 PM
Creation date
4/30/2012 1:52:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
4/24/2012
Doc Name
Midterm Permit Review (MT6)
From
DRMS
To
Blue Mountain Energy, Inc
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Protection of Archaeological Resources <br />IF OPERATOR DISCOVERS ANY CULTURAL REMAINS, MONUMENTS OR SITES, <br />OR ANY OBJECT OF ANTIQUITY, OPERATOR SHALL IMMEDIATELY CEASE <br />ACTIVITY AND REPORT DIRECTLY TO BLM AREA MANAGER. THE BLM SHALL <br />TAKE ACTION AS REQUIRED UNDER THE ACTS AND REGULATIONS. <br />OPERATOR SHALL FOLLOW MITIGATION REQUIREMENTS SET FORTH BY BLM <br />CONCERNING PROTECTION, PRESERVATION OR DISPOSITION OF ANY SITES <br />OR MATERIAL DISCOVERED. COST OF SALVAGE EXCAVATION, IF NECESSARY, <br />SHALL BE BORNE BY THE OPERATOR UNLESS OTHERWISE STATED. <br />Stipulation No. 51 <br />Protection of Seasonal Wildlife Habitat <br />IN ORDER TO PROTECT IMPORTANT SEASONAL WILDLIFE HABITAT (BIG GAME, <br />SEVERE WINTER RANGE), EXPLORATION, DRILLING AND OTHER <br />DEVELOPMENT ACTIVITY MAY NOT BE ALLOWED FOR UP TO 60 DAYS DURING <br />THE PERIOD FROM DECEMBER 1 THROUGH MARCH 31. THIS LIMITATION DOES <br />NOT APPLY TO MAINTENANCE AND OPERATION OF EXISTING FACILITIES. <br />EXCEPTIONS TO THIS LIMITATION IN ANY YEAR MAY BE SPECIFICALLY <br />AUTHORIZED IN WRITING BY THE AREA MANAGER, BUREAU OF LAND <br />MANAGEMENT. <br />Stipulation No. 52 <br />Construction of Drill Sites and Access Roads <br />DRILL SITES AND ACCESS ROADS CONSTRUCTED PURSUANT TO TR -44 SHALL <br />BE LOCATED AS AUTHORIZED BY THE BUREAU OF LAND MANAGEMENT TO <br />ENSURE PROTECTION OF ARCHAEOLOGICAL RESOURCES. <br />Section IV <br />Enforcement Actions <br />This section is a review of the enforcement actions issued since the last permit renewal <br />(RN -05) in June 2009. There have been no enforcement actions taken in the last 2'/2 <br />years since the approval of Permit Renewal No. 5. The last enforcement action was <br />taken in July 2002 at this site. <br />Section V <br />Summary and Discussion <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.