Laserfiche WebLink
Revision Number <br />Description <br />Date Approved <br />MR -143 <br />DP -1 Pond Outlet & Lagoon Pump <br />April 2010 <br />MR -144 <br />SH -3 & Western Wheatgrass <br />Sept. 2010 <br />MR -145 <br />Degas Boreholes & Nitrogen Boreholes <br />March 2011 <br />MR -146 <br />Nitrogen Pipeline <br />April 2011 <br />MR -147 <br />Revised Perimeter Marker Plan <br />June 2011 <br />MR -148 <br />RS -6 <br />Sept. 2011 <br />MR -149 <br />Plugging of Wells <br />Jan. 2012 <br />Technical Revisions since Renewal No. 5 (RN -05) <br />Revision Number <br />Description <br />Date Approved <br />TR -67 <br />Degas Boreholes, Return Shaft & Light <br />Sept. 2009 <br />Use Road <br />I L TR -68 <br />B -Seam Dewatering System <br />June 2011 <br />Section III <br />Status of Stipulations <br />The stipulation history for the Deserado Mine was reviewed as part of the Midterm <br />Review. The following is a discussion of the stipulations that were noted as active or <br />future in the database, or issued as a result of the last Permit Renewal (RN -05). <br />Review included investigation of the stipulation response file, revisions to the permit, <br />and the findings document for RN -05. Stipulations are a binding part of the permit and <br />previously assigned stipulation numbers are not to be re -used. Any stipulations <br />associated with this permit and issued over the life of this operation which are not <br />discussed in this Midterm Review have been complied with or terminated. <br />There are three active stipulations for this mine site. All of the stipulations are perpetual <br />in nature and impose possible future obligations on the permittee when conducting <br />operations on BLM lands. <br />Stipulation No. 50 <br />7 <br />