My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-25_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2012-04-25_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:50 PM
Creation date
4/25/2012 10:24:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/25/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 74 of 116 <br />Truck Bed (volume) Basis <br />Struck Volume: <br />12.00 <br />LCY <br />Heaped Volume: <br />18.00 <br />LCY <br />Average Volume: <br />15.00 <br />LCY <br />Adjusted Volume: <br />17.34 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: <br />Loading Tool Capacity_ <br />Net Cycle Tune Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />Bucket Size Class: NA <br />Rated Capacity: 3.900 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist at <br />Adjusted Capacity: 3.803 LCY <br />15.21 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7500 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.483 minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiencv: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.483 minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />I (Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 1.308 <br />Truck Maneuver and Dump Time: 0.90 <br />Truck Travel (Haul & Return) Time: <br />enetration 5.0 <br />s (95 -100 %) 0.975 <br />-0.080 Minutes <br />0.403 Minutes <br />1.308 Minutes <br />Minutes Adjusted for site altitude: 0.500 Minutes <br />Minutes Adjusted for site altitude: 1.308 Minutes <br />Minutes Adjusted for site altitude: 0.900 Minutes <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />4 passes <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.