Laserfiche WebLink
Page 73 of 116 <br />Task description: <br />Site: King Coal Mine <br />PROJECT IDENTIFICATION <br />TRUCK/LOADER TEAM WORK <br />II - Haul coal waste rock to King I waste pi <br />Permit Action: Permit Renewal 6 <br />Task #: 300 State: Colorado <br />Date: 4/23/2012 County: La Plata <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Permit/Job #: C1981035 <br />Abbreviation: None <br />Filename: CO35 -300 <br />Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team - Truck: Generic 12 -18 cy_ , 6x4 <br />- Loader: CAT 938H <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />CAT 938H <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $298.05 <br />MATERIAL OUANTITIES <br />Initial volume: 37 CCY Swell factor: 1.000 <br />Loose volume: 37 LCY <br />Source of estimated volume: Assume 100 sf x 10 ft high <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Truck Capacity: <br />Truck Payload (weight) B <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />HOURLY PRODUCTION <br />asis: <br />2,900 Pounds/LCY <br />User Provided <br />50,300 Pounds <br />17.34 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$14.78 <br />$22.07 <br />NA <br />$22.07 <br />NA <br />NA <br />Operating cost/hour: <br />$65.18 <br />$37.34 <br />NA <br />$3734 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.49 <br />NA <br />$38.49 <br />NA <br />NA <br />Unit Subtotals: <br />$102.25 <br />$97.90 <br />NA <br />$97.90 <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $200.15 <br />Support: $97.90 <br />Maint: $0.00 <br />Total work team cost/hour: $298.05 <br />MATERIAL OUANTITIES <br />Initial volume: 37 CCY Swell factor: 1.000 <br />Loose volume: 37 LCY <br />Source of estimated volume: Assume 100 sf x 10 ft high <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Truck Capacity: <br />Truck Payload (weight) B <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />HOURLY PRODUCTION <br />asis: <br />2,900 Pounds/LCY <br />User Provided <br />50,300 Pounds <br />17.34 LCY <br />CIRCES Cost Estimating Software <br />