Laserfiche WebLink
Page 75 of 116 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />Time <br />min <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />-6.50 <br />2938 <br />3.705 <br />1 <br />10560.00 <br />11.50 <br />5.00 <br />16.50 <br />690 <br />15.314 <br />Return Route: <br />Haul Time <br />15.314 <br />minutes <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( ° fo) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />10560.00 <br />-11.50 <br />5.00 <br />-6.50 <br />2938 <br />3.705 <br />CIRCES Cost Estimating Software <br />Return Time: 3.705 <br />minutes <br />Total Truck Cycle Time: 21.727 <br />minutes <br />Loading Tool unit <br />Production <br />504.90 <br />LCY/Hour Adjusted for job efficiency: <br />419.06 LCY/Hour <br />Truck Unit Production <br />42.00 <br />LCY/Hour Adjusted for job efficiency: <br />34.86 LCY/Hour <br />Optimal No. of Trucks: <br />12 <br />Truck(s) Selected Number of Trucks: <br />1 Truck(s) <br />Adjusted hourly truck team production: 34.86 <br />LCY/Hour <br />Adjusted single truck /loader team production: 34.86 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 34.86 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 1.06 <br />Hours <br />Unit cost: <br />$8.549 <br />/LCY Total job cost: $316.32 <br />CIRCES Cost Estimating Software <br />