My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:45 PM
Creation date
4/24/2012 10:46:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
4/24/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
Jim Stark
To
Marcia Talvitie
Email Name
JRS
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered. <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />5000.00 <br />0.00 <br />3.00 <br />3.00 <br />2409 <br />2.512 <br />Haul Time: 2.512 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.800 /LCY <br />Total job time: 795.18 Hours <br />Total job cost: $1,620,220.48 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Production <br />1 <br />5000.00 <br />0.00 <br />3.00 <br />3.00 <br />3503 <br />1.699 <br />410.55 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.800 /LCY <br />Total job time: 795.18 Hours <br />Total job cost: $1,620,220.48 <br />CIRCES Cost Estimating Software <br />Return Time: 1.699 <br />minutes <br />Total Truck Cycle Time: 8.491 <br />minutes <br />Loading Tool unit <br />Production <br />1,363.64 LCY/Hour Adjusted for job efficiency: <br />1,131.82 LCY/Hour <br />Truck Unit Production <br />494.64 LCY/Hour Adjusted for job efficiency: <br />410.55 LCY/Hour <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,231.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,131.82 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.800 /LCY <br />Total job time: 795.18 Hours <br />Total job cost: $1,620,220.48 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.