Laserfiche WebLink
Truck Bed (volume) Basis: <br />Struck Volume: <br />60.60 <br />LCY <br />Heaped Volume: <br />78.80 <br />LCY <br />Average Volume: <br />69.70 <br />LCY <br />Adjusted Volume: <br />78.43 <br />LCY <br />Truck Ownership: <br />Final Truck <br />Volume Based on Number of Loader Passes: 70.00 <br />Loading Tool Capacity <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Bucket Size Class: NA <br />Rated Capacity: <br />16.000 <br />(Cat HB) <br />LCY (heaped) <br />Bucket Fill Factor: <br />0.875 <br />Blasted rock - well blasted (80 - 95 %) 0.875 <br />Adjusted Capacity: <br />14.000 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft): 5000 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: <br />Truck <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.625 minutes <br />LCY <br />5 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: <br />Truck <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.625 minutes <br />LCY <br />5 passes <br />Cycle Time Factors <br />Minutes <br />Factor (min.) <br />Source <br />Material: <br />Material 3/4" to 6" diameter 0.00 <br />0.000 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dum p Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />Truck Cycle Time: <br />Truck Exchange Time: 0.80 Minutes <br />Truck Load Time: 2.280 Minutes <br />Truck Maneuver and Dump Time: 1.20 Minutes <br />-0.080 minutes <br />0.545 minutes <br />2.280 minutes <br />Adjusted for site altitude <br />Adjusted for site altitude <br />Adjusted for site altitude <br />0.800 <br />Minutes <br />2.280 <br />Minutes <br />1.200 <br />Minutes <br />CRCES Cost Estimating Software <br />