Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Trailing Spoil Ridges <br />Permit Action: 2012 New Permit <br />Site: New Horizon North Mine Estimate Permit/Job #: C2010089 <br />PROJECT IDENTIFICATION <br />Task #: 003 State <br />Date: 02- Mar -12 County <br />User: JRS <br />Colorado <br />Montrose <br />Agency or organization name: DRMS <br />HOURLY EQL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D1 1R - 11U <br />850 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C089 -003 <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$131.18 <br />NA <br />Operating Cost/Hour: <br />$274.62 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />2,750,000 <br />Swell factor: <br />1.000 <br />Loose volume: <br />2,750,000 LCY <br />Source of estimated volume: Map 2.05.2 -1; Section 2.05.4(2)(c) <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />300 feet <br />1,055.6 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -25 % <br />Average site altitude: 5,000 feet <br />Material weight: <br />Weight description: <br />2.550 lbs/LCY <br />Sandstone <br />CIRCES Cost Estimating Software <br />