My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-04-29_PERMIT FILE - C1981008A (42)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1988-04-29_PERMIT FILE - C1981008A (42)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 3:44:20 PM
Creation date
4/19/2012 1:06:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
4/29/1988
Doc Name
Reclamation Schedule
Section_Exhibit Name
Tab 19
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Action Taken Time Period <br /> Harvesting will commence in order to No later 11-han eight years after <br /> determine the reclaimed land's permanent seeding <br /> productivity and its capability to <br /> withstand use (crop harvesting will <br /> either be accomplished mechanically or <br /> by domestic livestock use) <br /> The site's productivity will be Ten years after permanent seeding <br /> estimated and compared to the <br /> reference area and to premining <br /> vegetation productivity <br /> Phase III bond release is ready for After all disturbed areas have been <br /> implementation observed for a minimum of ten years <br /> Cessation of Operations <br /> In the event a cessation of mining and reclamation operations is to occur for a period of <br /> 30 days or more, or as soon as it is known that a temporary cessation will extend beyond <br /> 30 days, the Division will be notified. Within 90 dens after notification, a notice of <br /> intention will be submitted to the Division defining the information required in Rule <br /> 4.30.1 and 4.30.2 as applicable. <br /> Abandonment Plan <br /> After all coal resource permit areas have been mined or a notice of intention to abandon <br /> operation has been submitted, the following procedures will be employed: <br /> LAST ACTIVE PIT AND HIGHWALL. After all coal is removed, the highwall will be reduced and <br /> the area backfilled and graded. The site will he prepared and topsoil replaced. <br /> Reclamation will proceed in accordance with the approved plan. <br /> HAUL ROADS. All haulage roads will be removed, topsoiled and seeded and reclamation will <br /> proceed in accordance with the approved plan. <br /> 19-6 Revised 04/11/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.