Laserfiche WebLink
Action Taken Time Period <br /> Harvesting will commence in order to No later 11-han eight years after <br /> determine the reclaimed land's permanent seeding <br /> productivity and its capability to <br /> withstand use (crop harvesting will <br /> either be accomplished mechanically or <br /> by domestic livestock use) <br /> The site's productivity will be Ten years after permanent seeding <br /> estimated and compared to the <br /> reference area and to premining <br /> vegetation productivity <br /> Phase III bond release is ready for After all disturbed areas have been <br /> implementation observed for a minimum of ten years <br /> Cessation of Operations <br /> In the event a cessation of mining and reclamation operations is to occur for a period of <br /> 30 days or more, or as soon as it is known that a temporary cessation will extend beyond <br /> 30 days, the Division will be notified. Within 90 dens after notification, a notice of <br /> intention will be submitted to the Division defining the information required in Rule <br /> 4.30.1 and 4.30.2 as applicable. <br /> Abandonment Plan <br /> After all coal resource permit areas have been mined or a notice of intention to abandon <br /> operation has been submitted, the following procedures will be employed: <br /> LAST ACTIVE PIT AND HIGHWALL. After all coal is removed, the highwall will be reduced and <br /> the area backfilled and graded. The site will he prepared and topsoil replaced. <br /> Reclamation will proceed in accordance with the approved plan. <br /> HAUL ROADS. All haulage roads will be removed, topsoiled and seeded and reclamation will <br /> proceed in accordance with the approved plan. <br /> 19-6 Revised 04/11/88 <br />