Laserfiche WebLink
SHOP AND FACILITIES. Assuming Peabody does not receive any bonafide requests from the <br /> eventual landowner to leave any existing facilities, all remaining structures will be <br /> disassembled and the foundations broken and buried at the County Landfill site. After <br /> grading, the area will be topsoiled and revegetated according to Tabs 21 and 22. <br /> POWER LINES. Power lines and power poles will be removed. The holes left after pole <br /> removal will be filled and seeded with approved seed mix. <br /> FENCES. Perimeter fences or other fences not located on property lines will be removed <br /> and the post holes backfilled and revegetated according to Tab 22. <br /> EXPLOSIVE STORAGE AREA. The explosive storage area and associated entrance road will be <br /> ripped, graded, either subsoiled or topsoiled, and revegetated. <br /> ACCESS ROADS NOT ASSOCIATED WITH SEDIMENT POND ABANDONMENT. Those access roads remaining <br /> at the time of final abandonment will be ripped, culverts removed, graded and the site <br /> topsoiled. They will be planted and seeded with the seed mixes according to Tab 22. <br /> SEDIMENTATION PONDS AND ACCESS ROADS TO THESE PONDS. After all other areas have been <br /> reclaimed and have undergone the ten-year observation period for determining reclamation <br /> success, and assuming there are no bonafide requests to leave these ponds or roads for the <br /> future landowner, any remaining roads and ponds will be graded, ripped and either <br /> subsoiled or topsoiled. The abandoned roads will be seeded with Seed Mix #1 and the <br /> sedimentation pond will be seeded with a combination of Seed Mix #1 and Seed Mix #2, based <br /> on site conditions, and planted with species from Shrub and Tree Planting List #1 and #2 <br /> (see Tab 22). Reclamation will proceed in accordance with the approved plan. <br /> 19-7 Revised 04/11/88 <br />