My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-04-29_PERMIT FILE - C1981008A (42)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1988-04-29_PERMIT FILE - C1981008A (42)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 3:44:20 PM
Creation date
4/19/2012 1:06:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
4/29/1988
Doc Name
Reclamation Schedule
Section_Exhibit Name
Tab 19
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the number of acres graded annually is approximately equal to the number of acres <br /> disturbed annually. In certain circumstances, this generalization may not apply because <br /> of material needed to achieve the designed postmining land form. For example, the <br /> backfiliing and grading of final highwalls may require up to one year after final coal <br /> removal for final grading. All of the acres graded in a given year are projected to be <br /> topsoiled and seeded as soon as practicable. <br /> Reclamation Scheduling (see Exhibits 19-1 and 19-2) <br /> Action Taken Time Period <br /> Bonds procured Prior to mine disturbance <br /> Topsoil removed and stored or Prior to mine disturbance <br /> directly replaced <br /> Final grading and regraded spoil After coal is removed <br /> sampling (Phase I bond release is <br /> ready for implementation) <br /> Areas which are severely compacted Final grading is completed <br /> or have slopes greater than 10:1 <br /> will be ripped on the contour and <br /> topsoil replaced <br /> Area is drill seeded with the First appropriate planting season <br /> appropriate perennial seed mix, after topsoil is replaced <br /> shrubs and trees are seeded or <br /> planted (Phase II bond release is <br /> ready for implementation). A small <br /> grain cover crop is applied at a rate <br /> of 20 (drilled) or 40 (broadcast) <br /> lbs/acre <br /> Replaced topsoil will be sampled, When indicated by the results of <br /> tested and evaluated. Soil soil tests <br /> amendments will be added <br /> 19-5 Revised 08/19/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.