Laserfiche WebLink
supply sources, quantities and water rights. Sections 4. 3 <br /> and 4 .4 provide details about the augmentation plan and a <br /> monitoring program, respectively. <br /> 4. 1 OVERVIEW <br /> The objective of the proposed augmentation plan is to <br /> provide a means of preventing impacts to water rights caused <br /> by: <br /> a. PCC's out-of-priority storage and consumptive use <br /> of water from the already constructed and proposed <br /> ponds (Figure 2) ; and <br /> b. Pit inflows that result in removal of water from <br /> the shallow aquifer which supplies some surface-water <br /> rights via springs and seeps. <br /> The objectives of the plan are achieved as follows: <br /> 1. Any impacts to surface-water rights from PCC's out- <br /> of-priority storage and water use will be prevented <br /> by: providing an adequate discharge of water by <br /> pumping or other means of release from the ponds, or <br /> releasing augmentation water from the CC canal and <br /> its distribution system. <br /> 19 <br /> GEOTRANS, INC. <br />