Laserfiche WebLink
2. Pit-inflow induced impact to surface-water rights will be <br /> prevented by providing a replacement supply from the <br /> surface-water distribution system. These rights <br /> obtain water from springs and seeps which are not <br /> completely supplied by surface-return flows. <br /> 3. Neither PCC's out-of-priority surface-water use <br /> nor pit inflows have been determined to cause any <br /> impact to the twenty-nine wells (Figure 2 , Table 8) <br /> within two miles of the NUCLA and NUCLA EAST mining <br /> areas. The screened interval and pump intakes of <br /> these wells are too deep to be affected by mining. <br /> The two shallowest wells closest to the pit will be <br /> monitored, however, if permission is obtained from <br /> the well owners. <br /> Implementation of the augmentation plan requires <br /> approval by the District Court of the following applications: <br /> 1. Change of Water Right: On approval, this will <br /> change the water right associated with the 27 shares <br /> of the Colorado Co-operative Company, from <br /> irrigation, domestic, stock watering and municipal to <br /> include industrial use by direct flow and storage. <br /> 20 <br /> GEOTRANS, INC. <br />