Laserfiche WebLink
NUCLA PR NO. 2 <br /> these sections in relation to the regulations , a few concerns were <br /> identified. <br /> Comment: <br /> A. Page 13-15, sixth paragraph addresses the requirements of Rule <br /> 4.03.1(3)(d)(v) . This regulation references a 6 inch size limit <br /> rather than the referenced 9 inch. <br /> Response: <br /> Page 13-15 has been revised. <br /> Comment: <br /> B. Page 13-25 second paragraph addresses the requirements of Rule <br /> 4.03.2(3)(d)(viii ) . The regulation references an embankment <br /> steepness no greater than 1v: 1.5H rather than the referenced lv:2h. <br /> Response: <br /> Page 13-25 has been revised. <br /> Comment: <br /> C. Page 13-25 fourth paragraph addresses the requirements of Rule <br /> 4.03.2(3)(d)(ii ) . The regulation references side slope steepness <br /> no greater than lv:3h or 33 percent rather than the referenced <br /> lv:5h or 20 percent. <br /> Response: <br /> Page 13-25 has been revised. <br /> Comment: <br /> D. Page 13-25, seventh paragraph addressed the requirements of Rule <br /> 4.03.2(3)(d)(iv) . This regulation references a 6 inch size limit <br /> rather than the referenced 9 inch. <br /> Response: <br /> Page 13-25 has been revised. <br /> Comment: <br /> 2. Page 13-30 under "Design and Construction" specifically references <br /> salvaging topsoil from proposed light-use roads. No such specific <br /> reference was made during the discussions of haul and access roads <br /> even though it is presumed salvaging would occur. Please so <br /> specify to avoid any confusion. <br /> 15 <br />