Laserfiche WebLink
Tab 3 - Adjudication File <br /> Comment 1. <br /> RESPONSE: <br /> Attached are revised pages 2-14 and 3-26 which reflect the correct <br /> address of the Division. The St. Louis Office will be notified <br /> accordingly. <br /> Comment 2. <br /> RESPONSE: <br /> Revised page 3-22; reflecting the correct acreage of 426.6 acres , is <br /> attached. <br /> Also see attached revised page 3-12 for the current list of principal <br /> stockholders of Peabody Coal Company. <br /> Tab 6 - Geolo2y <br /> 2.04.6 Geology and Geochemistry (Steve Renner memo, January 16, 1987) <br /> Comment 1. <br /> RESPONSE: <br /> The Overburden Assessment section of Tab 6 (Pages 6-16 through 6-43WW) <br /> was revised to incorporate the following information: <br /> 1) The discussion section and appropriate tables were revised to <br /> reflect the proposed scraper/dozer mining method as opposed to <br /> the previous dragline/dozer mining method. <br /> 2) The references to dragline mixing were deleted. <br /> 3) The mitigation techniques for suspect constituents were <br /> reevaluated. <br /> 4) Duplication and overlap were reduced by integrating Addendum <br /> 6-1 into the former Overburden Assessment section contained in <br /> Tab 6 of Permit C-008-81. <br /> 5) The pagination within Appendices 6-1 through 6-4 was updated. <br /> 6) All outdated information contained in Appendices 6-3 and 6-4 <br /> was deleted. <br /> 2 <br />