Laserfiche WebLink
EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Task description: Mobilize /Demobilize Equipment for Pond Cleaning <br />Permit Action: 2012 Bond <br />Site: Northfield Mine Recalculation Pennit /Job #: C2006085 <br />PROJECT IDENTIFICATION <br />Task #: 081 State: Colorado <br />Date: 1/2/2012 Countv: Fremont <br />User: .1RS <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: C085 -081 <br />Shift `basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cyst Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost /hr/ unit <br />Cost /hr /unit <br />Size <br />Cost /hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat 320D L 9' -6" <br />23.70 <br />$24.63 <br />$88.67 <br />1 <br />$113.30 <br />$88.67 <br />$250.00 <br />Stick <br />Subtotals: I $113.30 I $88.67 I $250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost /hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost /hr/ fleet <br />Return Trip <br />Cost /hr/ fleet <br />Generic 7 -8 cv, 4a2 <br />$65.93 <br />2 <br />$131.86 <br />$131.86 <br />Subtotals: $131.86 $131.86 <br />CIRCES Cost Estimating Sott -ware <br />