Laserfiche WebLink
ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost /hr/ fleet <br />Return Trip <br />Cost /hr/ fleet <br />Water Tanker, 2,500 Gal. <br />$68.18 <br />1 <br />$68.18 <br />$68.18 <br />Fuel Tanker, 6x4, 210 HP <br />$81.14 <br />1 <br />$81.14 <br />$81.14 <br />Lube Truck, 6x4, 210 FIP <br />$94.90 <br />1 <br />$94.90 <br />$94.90 <br />Flatbed Truck, 6x4, 45K GVW <br />$115.89 <br />1 <br />$115.89 <br />$115:89 <br />Subtotals: $360.11 $360.11 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region` COLORADO SPRINGS <br />Total one -wav travel distance: <br />75.00 miles <br />Average Travel Speed: <br />40.00 tnph <br />Total Non - Roadable Mob/Demob Cost * <br />$10,708.93 <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />NA <br />4.75 <br />$1,35041 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />1.88 <br />1.88 <br />1.88 <br />1.88 <br />0.50 <br />NA <br />0.50 <br />NA <br />4.75 <br />3.75 <br />Total job time: 9.50 Hours <br />Total job cost: $12,09.34 <br />CIRCES Cost Estimating Soft -ware <br />