Laserfiche WebLink
EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />CANON CITY <br />Total one -wav travel distance: <br />10.00 miles <br />Average Travel Speed: <br />35.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />NA <br />0.50 <br />$842.01 <br />`* two round trips with haul rig: <br />0.57 <br />Total Roadable Mob/Demob Cost ** <br />$75.35 <br />** one round trip, no haul rig: <br />Transportation Cycle Tine' <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non- Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.29 <br />0.29 <br />0.29 <br />0.29 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.57 <br />0.57 <br />Total job timer <br />3.14 Hours <br />Total job cost: $917,36 <br />CIRCES Cost Estimating Soft -ware <br />